Florida Department of Environmental Protection Florida Department of Environmental Protection
More Protection, Less Process
* DEP Home * About DEP * Programs * Contact * Site Map * Search
MyFlorida.com  
Programs
» Water Home
» Beaches
» Drinking Water
» Everglades
» Grants & Loans
» Ground Water
» Mining & Minerals
» Monitoring
» Special Projects
» Springs
» Stormwater
» TMDLs
» Underground Injection
» Wastewater
» Water Policy
» Watersheds
» Wetlands
Information
» Forms & Applications
» Rules
» Permits
» Contacts
» Data
» Publications
» Public Notices
Navigation
» Sitemap

 

Get Adobe Acrobat Reader software.

Documents are Adobe Acrobat files, which will open in a new window, unless indicated, and require the free Reader Software.

Corner of tabMining and Minerals Regulation

Piney Point  ITN NO. 2005002C Background Information

 

ITN Background Information (90 KB)

List of Figures (Download the Figures - 5.3 MB)

  • Figure 1 - Aerial Photograph of Site
  • Figure 2 - Topographic Map of Site
  • Figure 3 - Aerial Photograph (2003 Operation Plan Information)
  • Figure 4 - Basic Closure Plan
  • Figure 5 - Cross Sections A and B
  • Figure 6 - Cross Sections C and D
  • Figure 7 - Cross Sections E-1 and E-2
  • Figure 8 - Cross Sections F and G
  • Figure 9 - Cross Sections H and I b b b
  • Figure 10 - Cross Sections J and K
  • Figure 11 - Typical Closure Details

List of Appendices

Appendix 1   Calendar Year 2003 Emergency Operations and Water Management Plan (19.1 MB)
Appendix 2   Contingency Plan / Response Procedures (11.6 MB)
Appendix 3   Water Year 2003 Water Monitoring Report (3.2 MB)
Appendix 4   Process Water Balance Projections (Updated July 7, 2004) (4.1 MB)
Appendix 5   Hydrogeologic Study to Quantify Fresh Groundwater Input Into Phosphogypsum Stack System (4.3 MB)
Appendix 6   Construction Drawings for Gypsum Stack System Closure Phase I (13.3 MB)
Appendix 7   Specifications for Gypsum Stack System Closure Phase I (260 KB)
Appendix 8   Construction Drawings for Gypsum Stack System Closure Phase II 12.4 MB)
Appendix 9   Specifications for Gypsum Stack System Closure Phase II (298 KB)
Appendix 10   Typical Technical Specifications for Gypsum Stack Side Slope and Top Gradient Closure Construction (89 KB)
Appendix 11   Construction Drawings for North Cooling Pond Conversion for Lime Sludge Disposal (6.7 MB)
Appendix 12   Process Water Management Fact Sheet (239 KB)
Appendix 13   July 7, 2004 FDEP Piney Point Status Update (194 KB)

Piney Point Questions and Answers Support Documentation

 


Mining and Minerals Regulation Home
2051 E. Dirac Drive (Collins Building) Tallahassee, FL 32310-3760  Phone (850) 488-8217  Fax (850) 488-1254
 

Last updated: January 06, 2009

  2600 Blair Stone Road M.S. 3500   Tallahassee, Florida 32399   850-245-8336 (phone) / 850-245-8356 (fax) 
DEP Home | About DEP  | Contact Us | Search |  Site Map